The production capacity will be expanded by installing a new press and two washing filters in the current Digesters, Washing, and Bleaching building, a very complex area due to the large number of existing piping layouts. Based on a full laser scan of the Digesters building, we created a 3D model of all existing equipment to integrate the 3D models of the new equipment and design all the piping connections between the new and existing equipment.